Infrastructure

Our Facilities

Unit I: The Mumbai HQ

Located in the industrial heart of Vikhroli, our Headquarters serves as the central nervous system for Tristar Group. This facility focuses on high-precision micro-moulding and complex PCB assembly.

  • 17,000 Sq. Ft. ESD-Protected Floor
  • Clean Room Class 100,000 (ISO 8)
  • R&D Prototyping Lab
Status: Operational
Status: Operational

Unit II: Vasai Mega-Plant

Our heavy-lifting facility designed for large-tonnage injection moulding and metal fabrication. This unit handles high-volume production runs with automated conveyor systems.

  • 5,000 Sq. Ft. Production Area
  • Heavy Metal Stamping (up to 400T)
  • Automated Paint Shop

Unit III: The Delhi NCR Hub

Strategically situated in Noida to serve the Northern automotive belt. This facility specializes in rapid prototyping, cable harness assembly, and consumer electronics.

  • 7,000 Sq. Ft. Integrated Plant
  • Testing & Validation Centre
  • Just-in-Time (JIT) Warehousing
Status: Operational
Status: Operational

Unit IV: Chennai Zone

Located near the Chennai Port, this unit focuses on export-oriented manufacturing and heavy metal fabrication for global clients. Optimized for seamless logistics.

  • 11,000 Sq. Ft. Heavy Engineering
  • Automated CNC Machining
  • Global Logistics Centre

Technical Arsenal

Best-in-class machinery for zero-defect production.

Injection Moulding

  • Engel Victory 850T
  • Sumitomo Electric 180T (x4)
  • Arburg Allrounder 50T (x2)

PCB Assembly

  • Yamaha SMT Mounter High-Speed
  • Reflow Oven 8-Zone
  • AOI Inspection 3D

Quality Lab

  • CMM Machine Zeiss
  • Spectrometer X-Ray
  • Salt Spray Chamber 1000h